|
小于等于1000 V交流电以及1500 V直流电低压配电系统的电气安全. 保护措施的测试, 测量或监测设备. 第16部分: 电气设备和/或医疗电气设备保护措施有效性的测试设备
Electrical safety in low voltage distribution systems up to 1 000 V a.c. and 1 500 V d.c. - Equipment for testing, measuring or monitoring of protective measures - Part 16 : equipment for testing the effectiveness of the protective measures of electrical
参考页数:26P.;A4
|
|
|
|
|
|
1000V交流和1500V直流以下的低压配电系统的电气安全性.防护测量用试验,测量或监测设备.第9部分:IT系统中绝缘失效定位设备
Electrical safety in low voltage distribution systems up to 1 000 V a.c. and 1 500 V d.c. - Equipment for testing, measuring or monitoring of protective measures - Part 9 : equipment for insulation fault location in IT systems
参考页数:35P.;A4
|
|
|
|
|
|
交流1000V和直流1500V以下低压配电系统中的电气安全.防护措施的试验、测量和监控设备.第6部分:TT、TN和IT系统中剩余电流装置(RCD)的有效性
Electrical safety in low voltage distribution systems up to 1 000 V a.c. and 1 500 V d.c. - Equipment for testing, measuring or monitoring of protective measures - Part 6 : effectiveness of residual current devices (RCD) in TT, TN and IT systems.
参考页数:17P.;A4
|
|
|
|
|
|
绝缘配合.第1部分:定义、原则和规则
Insulation co-ordination. Part 1 : definitions, priciples and rules.
参考页数:27P.;A4
|
|
|
|
|
|
绝缘配合.第2部分:使用导则
Insulation co-ordination. Part 2 : application guide.
参考页数:130P.;A4
|
|
|
|
|
|
轨道交通.绝缘配合.第1部分:基本要求.所有电气和电子设备的间隙和爬电距离
Railway applications - Insulation coordination - Part 1 : basic requirements - Clearances and creepage distances for all electrical and electronic equipment.
参考页数:45P.;A4
|
|
|
|
|
|
轨道交通.绝缘配合.第2部分:过电压和相关保护措施
Railway applications - Insulation coordination - Part 2 : overvoltages and related protection.
参考页数:12P.;A4
|
|
|
|
|
|
轨道交通.绝缘配合.第1部分:基本要求.所有电气和电子设备的间隙和蠕变距离
Railway applications - Insulation coordination - Part 1 : basic requirements - Clearances and creepage distances for all electrical and electronic equipment.
参考页数:7P.;A4
|
|
|
|
|
|
高压机械用棒材和盘材的绝缘性试验
Test of insulation of bars and coils of high-voltage machines.
参考页数:9P.;A4
|
|
|
|
|
|
小于等于1000 V交流电以及1500 V直流电低压配电系统的电气安全. 保护措施的测试, 测量或监测设备. 第15部分: IT系统中绝缘监测装置和IT系统中绝缘故障定位设备的功能性安全要求
Electrical safety in low voltage distribution systems up to 1 000 V a.c. and 1 500 V d.c. - Equipment for testing, measuring or monitoring of protective measures - Part 15 : functional saftey requirements for insulation monitoring devices in IT systems and equipment for insulation fault location in IT systems
参考页数:85P.;A4
|
|
|
|
|