|
发电站设备采购指南.正蒸汽轮机
Guide for the procurement of power station equipment - Steam turbines
参考页数:26P.;A4
|
|
|
|
|
|
汽轮机速度控制系统验收试验指南
Guide to acceptance tests for steam turbine speed control systems
参考页数:44P;A4
|
|
|
|
|
|
汽轮机热验收试验规程.大型冷凝汽轮机的高精度规范
Rules for steam turbine thermal acceptance tests - High accuracy for large condensing steam turbines
参考页数:86P.;A4
|
|
|
|
|
|
发电厂设备的购置说明.第5-1部分:蒸汽轮机
Guide for procurement of power station equipment - Part 5-1: Steam turbines; German version EN 45510-5-1:1998
参考页数:24P.;A4
|
|
|
|
|
|
燃烧式蒸汽发生器
Fired Steam Generators
参考页数:
|
|
|
|
|
|
发电用蒸汽轮机防水损坏的推荐实施规程
Prevention of Water Damage to Steam Turbines Used for Electric Power Generation: Fossil-Fueled Plants
参考页数:40P.;A4
|
|
|
|
|
|
发电用汽轮机水损害防护:核燃料厂
Prevention of Water Damage to Steam Turbines Used for Electric Power Generation: Nuclear-Fueled Plants
参考页数:40P.;A4
|
|
|
|
|
|
联合循环蒸汽涡轮机
Steam Turbines in Combined Cycles
参考页数:
|
|
|
|
|
|
动力循环中水和蒸汽的取样、调节和分析
Steam and Water Sampling, Conditioning and Analysis in the Power Cycle
参考页数:
|
|
|
|
|
|
附录A到PTC 6.蒸气轮机用试验代码
Appendix A to PTC 6, the Test Code for Steam Turbines
参考页数:
|
|
|
|
|